Harbor Construction · site document rules
9,840 characters · 7 sections
2Site codes
Every site has a code in the project list: HS14 is Harbor Street 14, RP03 is Ridge Park phase 3. Find the site from the delivery address or the order number, then use its code. Never the street name alone.
5Site photos
Name photos by date, site code and what they show, in two or three words: Crack, Rebar, Formwork. Add the level when a sign or a drawing in the photo shows it.
6Delivery notes
Name every delivery note by the delivery date, the site code, the supplier and the word DeliveryNote. If the note shows an order date and a delivery date, use the delivery date.
7Receipts
Name receipts by date, the shop, what was bought and the total with its decimals. Fuel, Tools and Materials are named as such. Anything else is Expense.